ERA Piping Systems, PVC Pipe Fitting, Reducing Nipple,TPF019,BS STANDARD, CE
System:
PVC fittings have proven superior performance in the industrial-piping, water-treatment, commercial-plumbing, irrigation and pool markets.
Our product line includes all common patterns including elbows, tees, couplings, bushings, unions and flanges.
Our product line includes all common patterns including elbows, tees, couplings, bushings, unions and flanges.
| Model Number | TPF019 | Material | PVC |
| Description | REDUCING NIPPLE | Size | 1/2''*3/4''-4''*3'' |
| Standard | BS EN 10026-2 / BS-21 | Color | WHITE/BLACK |
| Working Pressure | PN10 ,10Bar, 1.0Mpa | Temperature | Max 60°C / 140°F |
| Connection | BS THREAD | Certificate | CE |
Pipe and fittings shall be manufactured from virgid
PVC(polyvinyl chloride) vinyl compounds.
Non-toxic, odorless & tasteless
Fields of application:
Piping networks for water farming.
Main Products:
Broad market prospects
The global development trend of PVC industry chain is rapid, and the market prospect is broad. All countries in the world are interested in the development potential of PVC and its benefits to ecological environment protection. PVC is proving its function and influence to everyone with its excellent and distinctive characteristics. Power is irreplaceable by all other commodities. It is necessary for social and economic development, and it is necessary for ecological and environmental protection. It is the general trend of the development of social civilization.
Polyvinyl chloride is also a commonly used plastic, which is a resin composed of polyvinyl chloride resin, plasticizer, and antioxidant, and is not inherently non-toxic. But the main auxiliary materials such as plasticizers and antioxidants added are toxic. The plasticizers used in daily PVC plastics mainly include dibutyl terephthalate, dioctyl phthalate, etc. These chemicals are all toxic, and the antioxidant lead stearate of PVC is also toxic. Lead can precipitate from polyvinyl chloride (PVC) products containing lead salt antioxidants in contact with ethanol, ether, and other solvents. PVC containing lead salt is used as food packaging. When it meets deep-fried dough sticks, fried cakes, fried fish, cooked meat products, cakes and Dim sum, the lead molecules will diffuse into the oil. Therefore, PVC plastic bags cannot be used to contain food, especially oily food. In addition, PVC plastic products will slowly decompose into hydrogen chloride gas at high temperatures, such as around 50 ℃, which is harmful to human health. Therefore, PVC products should not be used as food packaging.
PVC pipe construction technology
1. Pipe processing: After the length of the pipe is determined, it can be cut manually with a hacksaw or with a circular saw blade or sawing machine. The incisions at both ends should be kept flat, and the burrs should be removed with butterfly tape and chamfered. The chamfer should not be too large.
2. Bonding of pipes and fittings: Trial assembly must be carried out before bonding. Clean about 50mm of the outer surface of the pipe end of the inserted pipe and the inner wall of the pipe fitting socket, then scrub once with cotton gauze coated with acetone, and then clean the two bonding surfaces. Use a brush to apply an even layer of adhesive without missing a layer. After coating, rotate to the ideal combination angle, insert the pipe into the socket of the pipe fitting, and tap it with a mallet so that all the pipes are inserted into the socket. Do not disassemble or change direction within two minutes. Wipe off the extruded joints in time. Glue to keep pipes clean.
a. Each layer of the riser pipe is equipped with an expansion joint to compensate for the thermal expansion and contraction of the counterflow pipe.
b. When installing the tee, pay attention to the direction along the water, so that the slope will naturally form when installing the horizontal pipe. c. If the height of each layer of the riser is less than 3m, consider installing a pipe hoop. The horizontal pipe is equipped with an elevator every 0.6m.
d. When the straight-line distance between horizontal pipes and drainage pipes is greater than the requirements in Table 4, inspection ports or cleaning ports should be provided.
FAQ:
1.What is your MOQ?
Our MOQ is usually 5 CTNS.
2.What is your delievery time?
The time of delievery is around 30-45days.
3.What is the shipping port?
We ship the goods via Ningbo or Shanghai port.
4.What is your payment terms?
We accept 30% T/T in advance,70% in the period of shipment or 100% L/C.
5.How should I contact you?
You can contact us with Trade Manager or send us an email by click Contact Supplier bottom.
6.What is the location of your company?
Our company is located in the Taizhou Zhejiang Province,China.
If you would like to have a visit, you are much welcome.
7.How about the samples?
We could send you the samples ,most samples are free to send to most places in China.If sent to other countries,transport fee shoule be paid by you.
8.Why choose us?
1 Genuine produces with excellent quality and competitive price.
2 Cooperating with the customers all over the world and knowing the markets very well.
3 ERA is a listed company. Everything can be rest assured working with us.
4 After- Services will be highly-satisfied. Any problems and feedbacks will be answered in a short of time.
Our Services:
1. Any inquiries will be replied within 24 hours
2. Professional manufacturer.
3. OEM is available.
4. High quality, standard designs, reasonable&competitive price, fast lead time.
5. Faster delivery: Sample will be prepared in 2-3days.
6. Shipping: We have strong cooperation with DHL, TNT, UPS, MSK, China Shipping, etc.
7. You can also choose your own shipping forwarder.