PPR water pipe correctly connected
2024-12-20
If the installation and connection of PPR water supply pipes for home decoration are not standardized,
it will be troublesome. It will seriously affect our household water supply and pipeline life in the later stage.
Nowadays, many homeowners are novices and do not understand anything. When installing water pipes,
they will be led by the nose by the plumber, and they are not sure whether the installation is good or bad.
Today we will talk about the correct steps for hot melt connection of PPR water supply pipes in home
decoration. The first step is to prepare the hot melt tools and remember to heat them up to 260 ℃ in advance;
Step two, measure with a tape measure and marker pen, and mark the depth of the hot melt; Step three,
we need to clean the connection ports with connecting pipes. If there are burrs, they need to be treated
before cleaning the surface; Step four, simultaneously press the pipe fittings and pipes without rotation into
the hot melt mold to the marked position; Step five, after reaching the specified hot melt time, immediately
insert the pipe into the fitting in a straight line without rotation until the pipe reaches the cooling time,
and then the fusion is completed. As homeowners, you must pay attention to
these small details of the construction master and not take them lightly.