1. Home
  2. Products
  3. Plastic Valves
  4. ERA Brand HDPE/PE/Plastic Ball Valves For Water and Gas with double purge
Categories
Valve with double purge
Valve with double purge
ERA Brand HDPE/PE/Plastic Ball Valves For Water and Gas with double purge
ERA Brand HDPE/PE/Plastic Ball Valves For Water and Gas with double purge
ERA Brand HDPE/PE/Plastic Ball Valves For Water and Gas with double purge
ERA Brand HDPE/PE/Plastic Ball Valves For Water and Gas with double purge
ERA Brand HDPE/PE/Plastic Ball Valves For Water and Gas with double purge
Valve with double purge
ERA Brand HDPE/PE/Plastic Ball Valves For Water and Gas with double purge
ERA Brand HDPE/PE/Plastic Ball Valves For Water and Gas with double purge
ERA Brand HDPE/PE/Plastic Ball Valves For Water and Gas with double purge
ERA Brand HDPE/PE/Plastic Ball Valves For Water and Gas with double purge
ERA Brand HDPE/PE/Plastic Ball Valves For Water and Gas with double purge

ERA Brand HDPE/PE/Plastic Ball Valves For Water and Gas with double purge

PEBV04
ERA Piping Systems,HDPE Fittings HDPE Pipe Fitting Manufacturer High Quality Ball Valve with Double Purge

ERA Piping Systems, Valve with double purge,PEBV04,BS STANDARD, CE

 

Model Number:

PEBV04

Material

PE/HDPE

Description:

Valve with double purge

Standard

ISO4427-2
ISO4427-3

Temperature:

Max 60℃ /140℉

Working Pressure:

PN10 ,10Bar, 1.0Mpa

Size:

63--400mm

Certificate:

CE

Connection:

Socket

Color:

BLACK

HDPE pipe can be installed utilizing trenchless technology under creeks, rivers, lakes, roads, or right-of-ways with minimal environmental and public disruption.
When compared to a non-plastic pipe installed using the open-cut method, a leak-free HDPE system installed utilizing less invasive trenchless technology is more cost effective.
1.Adaptability
    In addition to joining HDPE with heat fusion, HDPE pipe can also be joined with Stab or Mechanical Fittings.
    There are a wide range of these fittings available, specific to your pipe size and application.
    HDPE pipe can easily be transitioned to and from non-HDPE piping systems utilizing Mechanical Joint adapters (MJ’s), Stab fittings and Mechanical and Flanged Connections.

FAQ

1.What is your MOQ?

 Our MOQ is usually 5 CTNS.

2.What is your delievery time?

 The time of delievery is around 30-45days.

3.What is the shipping port?

 We ship the goods via Ningbo or Shanghai port.

4.What is your payment terms?

 We accept 30% T/T in advance,70% in the period of shipment or 100% L/C.

5.How should I contact you?

 You can contact us with Trade Manager or send us an email by click Contact Supplier bottom.

6.What is the location of your company?

Our company is located in the Taizhou Zhejiang Province,China.

If you would like to have a visit, you are much welcome.

7.How about the samples?

We could send you the samples ,most samples are free to send to most places in China.If sent to other countries,transport fee shoule be paid by you.

8.Why choose us?

1 Genuine produces with excellent quality and competitive price.

2 Cooperating with the customers all over the world and knowing the markets very well.

3 ERA is a listed company. Everything can be rest assured working with us.

4 After- Services will be highly-satisfied. Any problems and feedbacks will be answered in a short of time.