1. Home
  2. Products
  3. Pressure Pipe And Fittings
  4. PVC Pressure Pipes Fitting TYPE II (NBR5648)
  5. PVC FITTINGS REDUCING RING
Categories
PVC FITTINGS REDUCING RING
PVC FITTINGS REDUCING RING
PVC FITTINGS REDUCING RING
PVC FITTINGS REDUCING RING
PVC FITTINGS REDUCING RING
PVC FITTINGS REDUCING RING
PVC FITTINGS REDUCING RING
PVC FITTINGS REDUCING RING
PVC FITTINGS REDUCING RING
PVC FITTINGS REDUCING RING
PVC FITTINGS REDUCING RING
PVC FITTINGS REDUCING RING
PVC FITTINGS REDUCING RING

PVC FITTINGS REDUCING RING

USII008
ERA Piping Systems, PVC Pipe Fitting ,Type II, REDUCING RING ,US Ⅱ 008 Socket x BSPT, CE Specification: System: Polyvinyl chloride (PVC) is one of the most broadly used thermoplastic materials, common to many industries. PVCis suitable for use at temperatures from 0 º C to 60 º C at a wide range...

ERA Piping Systems, PVC Pipe Fitting ,Type II, REDUCING RING ,US Ⅱ008 Socket x BSPT, CE

Model Number:

US II 008

Material

PVC

Description:

REDUCING RING

Standard

NBR 5648

Temperature:

Max 60℃ /140℉

Working Pressure:

PN10 ,10Bar, 1.0Mpa

Size:

25*20--63*50MM

Certificate:

CE

Connection:

Socket or Thread

Color:

Blue

System:  

Polyvinyl chloride (PVC) is one of the most broadly used thermoplastic materials, common to many industries.

PVCis suitable for use at temperatures from 0ºC to 60ºC at a wide range of operating pressures, depending upon the system chosen. It is lightweight and easy to install, using cold solvent welded joints which require no special tools.

Scope:    

PVC fittings Solvent cement Manifold fittings

PVC-U allows the safe transportation of many acids, alkalis and chemical concentrates

without fear of corrosion and environmental pollution.

Specification:  

Tested and approved by the world’s premier certification institutes.

PVC-U is lightweight and is extremely easy to install which can save both time

and money on any given project when compared to other, more traditional

pipework materials.

Fields of application:

Piping networks for water farming.

Company Serve

1.Any inquiries will be replied within 24 hours.
2.Professional manufacturer.
3.OEM is available.
4.High quality,standard designs,reasonable&competitive price,fast lead time.
5.Faster delivery:Sample will be prepared in 2-3days.
6.Shipping:We have strong cooperation with DHL,TNT,UPS,MSK,China Shipping,etc.
7.You can also choose your own shipping forwarder.

In the process of installation, it should be noted that the fracture site should be flat, and there should be no deformation. The length of the groove should not be less than 3mm, and the thickness of the groove should be between one-third and one-half of the pipe wall. After the groove is completed, remember to clean up the debris. After the connection of the building is completed, the residual adhesive should be wiped clean. We need to wait for the interface to cure depending on the properties of the adhesive and climatic conditions. Generally speaking, the curing time should be appropriately extended during winter construction.